publishersunny
time2025/11/26

| Component | What to confirm |
| Inner layer | Support, lightweight compression or breathable mesh |
| Outer layer | Quick-dry coating, stretch, shape retention |
| Fabric performance | Fast moisture evaporation, cooling touch during movement |
Construction | Seamless or bonded hem for modern appearance |
Movement compatibility | Pattern adapted for high-intensity motion |
Customization options | Branding, panel design, pocket layout, perforation |
| Stage | Typical lead time |
| Initial sampling | ~10 days (if design confirmed) |
| Fit adjustment or lining revision | +5–7 days (if required) |
| Bulk production (materials ready) | ~30–45 days |
Delays usually happen during the design/refinement stage, not in production. Ensuring clear functionality expectations early will help maintain the launch schedule. | |
网络文化经营许可证:浙网文[2013]0268-027号|增值电信业务经营许可证:浙B2-20080224-1 2007-2025 Tradevv.com. All rights reserved.