Phase 1 – Concept Start (Nov–Dec 2025)
Select primary design(s) + define modifications: fabric base, color palette, waistband, logo, pocket structure.
Phase 2 – Prototype Production (Jan 2026)
Sample made within 10–12 days → testing/fitting → confirmation.
Phase 3 – Series Extension
Same fabric/structure used to expand into short sleeve tops, long training pants, or matching full training sets.
Phase 4 – Bulk Production (Feb–Mar)
Quantities scalable, latest 25–30 production days.