publishersunny
time2025/10/17

| Process | Lead Time | Key Features |
| Sample Development | 10–12 days | Digital pattern making, pre-tested fabrics |
| Bulk Production | 25–30 days | MES-controlled production lines |
| Fabric Sourcing | 5–7 days (from stock library) | 800+ fabric options with OEKO-TEX certification |
QC + Testing | Continuous | 6-step inspection + AATCC/ISO testing |
Logistics | 5–10 days (DDP available) | DHL / UPS / Sea + Air freig |
网络文化经营许可证:浙网文[2013]0268-027号|增值电信业务经营许可证:浙B2-20080224-1 2007-2025 Tradevv.com. All rights reserved.